31x25
Roxbury; Looking Back and Looking Ahead (2010)
← Back to episode
Translations 5
Chinese (zh-CN) |
||
---|---|---|
Name |
第 25 集 |
|
Overview |
—
|
|
English (en-US) |
||
---|---|---|
Name |
Roxbury; Looking Back and Looking Ahead |
|
Overview |
With just one week left in Roxbury, tile contractor Angelo McRae shows Kevin how to install meshed white subway tiles with a rail cap for the kitchen backsplash. Kevin visits our Washington, D.C. project house to meet the family that moved in and see how our last venture in non-profit development turned out. Then, general contractor Tom Silva lends a hand to lead carpenter Colin Paterson, who is customizing and installing the stair treads and newel post for the new stairs. |
|
French (fr-FR) |
||
---|---|---|
Name |
Épisode 25 |
|
Overview |
—
|
|
Korean (ko-KR) |
||
---|---|---|
Name |
에피소드 25 |
|
Overview |
—
|
|
Spanish; Castilian (es-MX) |
||
---|---|---|
Name |
Episodio 25 |
|
Overview |
—
|
|