Afsnit 25

1

Lexington: On a Mission

0%
28 september 202327m

The crew starts a new project in Lexington, MA, to make a 1960 mid-century modern home accessible for a family with a son who has Duchenne Muscular Dystrophy. The crew meets the homeowners to learn about the disease and the challenges the current setup of the house poses. The project is a race against time, but the crew is determined to get the family back into their home as soon as possible.

Læs mere

You need to be logged in to continue. Click here to login or here to sign up.

2

Lexington: Shore We Can

0%
5 oktober 202327m

The interior is demoed, and rebuilding has begun. The new design and energy code are explained.

Læs mere

Crew 0

Instrueret af: Ingen instruktør er blevet tilføjet.

Skrevet af: No writer has been added.

Gæste Stjerner 0 Alle Skuespillere & Medarbejdere

Ingen gæstestjerner er blevet tilføjet.

Afsnit Billeder 0 View All Episode Images

Ingen episode billeder er blevet tilføjet.

You need to be logged in to continue. Click here to login or here to sign up.

3

Lexington: The Big Dig

0%
12 oktober 202327m

Accessible features integrated into the design begin at construction. A new mechanical room connects to the old via a block wall tunnel, HVAC ducting is buried underground, and after learning about residential elevators, framing begins for one.

Læs mere

You need to be logged in to continue. Click here to login or here to sign up.

4

Lexington: Engineered For Accessibility

0%
19 oktober 202327m

A lally column stands in the way of the new open floor plan. As a solution, it is removed, and the ridge beam is replaced with a trio of engineered beams. The new landscape is previewed in 3D, and tips are shared for creating an accessible bathroom.

Læs mere

You need to be logged in to continue. Click here to login or here to sign up.

5

Lexington: Gone Geo

0%
26 oktober 202327m

A zero-threshold entry to the patio is framed. Geothermal energy is explained, and wells are dug.

Læs mere

You need to be logged in to continue. Click here to login or here to sign up.

6

Lexington: Reworked and Rewired

0%
2 november 202327m

The fully framed front of the house is revealed; work continues on the geothermal system; the connection to the interior is made; blocking is installed in the framing; replacing and rewiring old receptacles.

Læs mere

You need to be logged in to continue. Click here to login or here to sign up.

7

Lexington: Ramping Up

0%
9 november 202327m

Repairing the original brick; building a DIY ramp; touring a modern accessible home; adding trim to the exterior.

Læs mere

You need to be logged in to continue. Click here to login or here to sign up.

8

Lexington: Drop in the Gutter

0%
16 november 202327m

A walking tour of the roof reveals its various pitches; installing a built-in gutter system; rough-in begins on the interior; energy-efficient windows are installed.

Læs mere

You need to be logged in to continue. Click here to login or here to sign up.

9

Lexington: Phased Out

0%
4 januar 202427m

Work on the house is divided into phases for efficient workflow; the back foundation gets a stucco finish; kitchen cabinet selection; installing siding; the back patio gets proper drainage.

Læs mere

You need to be logged in to continue. Click here to login or here to sign up.

10

Lexington: Seven Layer Floors

0%
11 januar 202427m

The slab-on-grade foundation is built up; accessible AV solutions are explored; prep begins for a curbless shower; installing an automatic zero threshold door.

Læs mere

You need to be logged in to continue. Click here to login or here to sign up.

11

Lexington: Electrical Bond

0%
18 januar 202427m

Copper bonding is installed before the therapy pool is craned in; tile selections are revealed; the integrated entrance ramp gets snow melt and a final layer of concrete; elevator disconnects are installed.

Læs mere

You need to be logged in to continue. Click here to login or here to sign up.

12

Lexington: Upcycled

0%
25 januar 202427m

Building the elevator cab; using leftover flooring to make a modern feature for the kitchen island; exploring AV solutions for accessibility; installing new solar panels.

Læs mere

You need to be logged in to continue. Click here to login or here to sign up.

13

Lexington: Install With Care

0%
1 februar 202427m

Work on the internal geothermal systems begins; installing in-wall lighting to illuminate the entrance ramp; installing an offset p-trap; a visit to a glass-blowing studio; grab bar installation begins.

Læs mere

You need to be logged in to continue. Click here to login or here to sign up.

14

Lexington: All in the Family

0%
8 februar 202427m

Landscape planting begins with screen trees and rose bushes; the children pitch in on a painting project; the homeowners discuss Duchenne muscular dystrophy; a modern staircase is installed in the foyer.

Læs mere

You need to be logged in to continue. Click here to login or here to sign up.

15

Lexington: Judgement Day

0%
15 februar 202427m

Geothermal is in; kitchen appliances are installed; the new HERS score is revealed.

Læs mere

You need to be logged in to continue. Click here to login or here to sign up.

16

Lexington: Accessible Made Modern

0%
22 februar 202427m

The completed renovation of the 1960 mid-century modern home accommodates a family of five, including a child with Duchenne muscular dystrophy; the crew returns to go through the changes with the family.

Læs mere

You need to be logged in to continue. Click here to login or here to sign up.

17

Glen Ridge: Multi-Generational

0%
28 marts 202427m

The crew heads to New Jersey for the second project of the season - an 1897 Victorian in the Borough of Glen Ridge that's being renovated for multi-generational living. The homeowners give the crew a tour and explain how the new spaces will be used.

Læs mere

You need to be logged in to continue. Click here to login or here to sign up.

18

Glen Ridge: Vintage

0%
4 april 202427m

Demo has begun uncovering 150-year-old wine bottles in the walls. A chimney is demolished, and the roof is reframed. The architect shares his inspiration for the project, and the mayor gives a tour of the Borough's gas lamps. Asbestos is abated.

Læs mere

You need to be logged in to continue. Click here to login or here to sign up.

19

Glen Ridge: Small But Mighty

0%
11 april 202427m

Termite damage has caused major construction changes. New footings are needed in the basement. A historic community garden is toured. A 15-year-old student talks about working on the project. The old sewer line is replaced without trenching.

Læs mere

You need to be logged in to continue. Click here to login or here to sign up.

20

Glen Ridge: QR Construction

0%
18 april 202427m

Installing helical piers for the new porch; prepping new windows for installation; protecting plumbing pipes from cold weather.

Læs mere

You need to be logged in to continue. Click here to login or here to sign up.

21

Glen Ridge: Roughed In

0%
25 april 202427m

The new flangeless windows are installed water and air tight. Preparation begins for in-ceiling speakers. The Empire State Building is visited. Porch decking is installed to minimize waste, and a hybrid plumbing system is chosen for the house.

Læs mere

You need to be logged in to continue. Click here to login or here to sign up.

22

Glen Ridge: Next Level Tight

0%
2 maj 202427m

Air tightness is taken to the next level with vapor barrier electrical boxes. The homeowner designs a custom lead glass sidelight. Various types of weather-resistant barriers are explored. Drip edge flashing and exterior window trim are installed.

Læs mere

You need to be logged in to continue. Click here to login or here to sign up.

23

Glen Ridge: A Breath of Fresh Air

0%
9 maj 202427m

The new staircase is manufactured in a shop and assembled on-site. The shop is toured. The homeowner installs a new brick walkway. Wood fiber insulation and the new HRV system are explored. The architect talks about the interior trim details

Læs mere

You need to be logged in to continue. Click here to login or here to sign up.

24

Glen Ridge: Tested and Approved

0%
16 maj 202427m

A blower door test reveals the home's airtightness; a baseboard trim gets a radius detail; discussing the borough's effort to maintain its tree-lined streets; installing a prefab tile niche; prepping interior trim for paint finish.

Læs mere

You need to be logged in to continue. Click here to login or here to sign up.

25

Glen Ridge: Spring Forward

0%
23 maj 202427m

Building a custom mudroom bench from reclaimed wood; the primary bathroom gets a custom paint finish; spring landscaping; installing kitchen crown molding above the cabinets and recessed lighting.

Læs mere

You need to be logged in to continue. Click here to login or here to sign up.

Tilbage til toppen

You need to be logged in to continue. Click here to login or here to sign up.

Kan du ikke finde en film eller TV-serie? Log in og opret den.

Global

s focus the search bar
p open profile menu
esc luk et åbent vindue
? open keyboard shortcut window

På mediesider

b go back (or to parent when applicable)
e go to edit page

On TV season pages

(right arrow) go to next season
(left arrow) go to previous season

On TV episode pages

(right arrow) go to next episode
(left arrow) go to previous episode

På alle billedesider

a open add image window

On all edit pages

t open translation selector
ctrl+ s submit form

På diskussionssider

n opret ny diskussion
w toggle watching status
p toggle public/private
c toggle close/open
a åben aktivitet
r reply to discussion
l go to last reply
ctrl+ enter submit your message
(right arrow) next page
(left arrow) previous page

Indstillinger

Want to rate or add this item to a list?

Log ind