Episodes 25

1

Lexington: On a Mission

0%
September 28, 202327m

The crew starts a new project in Lexington, MA, to make a 1960 mid-century modern home accessible for a family with a son who has Duchenne Muscular Dystrophy. The crew meets the homeowners to learn about the disease and the challenges the current setup of the house poses. The project is a race against time, but the crew is determined to get the family back into their home as soon as possible.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

2

Lexington: Shore We Can

0%
October 5, 202327m

The interior is demoed, and rebuilding has begun. The new design and energy code are explained.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

3

Lexington: The Big Dig

0%
October 12, 202327m

Accessible features integrated into the design begin at construction. A new mechanical room connects to the old via a block wall tunnel, HVAC ducting is buried underground, and after learning about residential elevators, framing begins for one.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

4

Lexington: Engineered For Accessibility

0%
October 19, 202327m

A lally column stands in the way of the new open floor plan. As a solution, it is removed, and the ridge beam is replaced with a trio of engineered beams. The new landscape is previewed in 3D, and tips are shared for creating an accessible bathroom.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

5

Lexington: Gone Geo

0%
October 26, 202327m

A zero-threshold entry to the patio is framed. Geothermal energy is explained, and wells are dug.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

6

Lexington: Reworked and Rewired

0%
November 2, 202327m

The fully framed front of the house is revealed; work continues on the geothermal system; the connection to the interior is made; blocking is installed in the framing; replacing and rewiring old receptacles.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

7

Lexington: Ramping Up

0%
November 9, 202327m

Repairing the original brick; building a DIY ramp; touring a modern accessible home; adding trim to the exterior.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

8

Lexington: Drop in the Gutter

0%
November 16, 202327m

A walking tour of the roof reveals its various pitches; installing a built-in gutter system; rough-in begins on the interior; energy-efficient windows are installed.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

9

Lexington: Phased Out

0%
January 4, 202427m

Work on the house is divided into phases for efficient workflow; the back foundation gets a stucco finish; kitchen cabinet selection; installing siding; the back patio gets proper drainage.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

10

Lexington: Seven Layer Floors

0%
January 11, 202427m

The slab-on-grade foundation is built up; accessible AV solutions are explored; prep begins for a curbless shower; installing an automatic zero threshold door.

Read More

Crew 0

Directed by: No director has been added.

Written by: No writer has been added.

Guest Stars 0 Full Cast & Crew

No guest stars have been added.

Episode Images 0 View All Episode Images

No episode images have been added.

You need to be logged in to continue. Click here to login or here to sign up.

11

Lexington: Electrical Bond

0%
January 18, 202427m

Copper bonding is installed before the therapy pool is craned in; tile selections are revealed; the integrated entrance ramp gets snow melt and a final layer of concrete; elevator disconnects are installed.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

12

Lexington: Upcycled

0%
January 25, 202427m

Building the elevator cab; using leftover flooring to make a modern feature for the kitchen island; exploring AV solutions for accessibility; installing new solar panels.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

13

Lexington: Install With Care

0%
February 1, 202427m

Work on the internal geothermal systems begins; installing in-wall lighting to illuminate the entrance ramp; installing an offset p-trap; a visit to a glass-blowing studio; grab bar installation begins.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

14

Lexington: All in the Family

0%
February 8, 202427m

Landscape planting begins with screen trees and rose bushes; the children pitch in on a painting project; the homeowners discuss Duchenne muscular dystrophy; a modern staircase is installed in the foyer.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

15

Lexington: Judgement Day

0%
February 15, 202427m

Geothermal is in; kitchen appliances are installed; the new HERS score is revealed.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

16

Lexington: Accessible Made Modern

0%
February 22, 202427m

The completed renovation of the 1960 mid-century modern home accommodates a family of five, including a child with Duchenne muscular dystrophy; the crew returns to go through the changes with the family.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

17

Glen Ridge: Multi-Generational

0%
March 28, 202427m

The crew heads to New Jersey for the second project of the season - an 1897 Victorian in the Borough of Glen Ridge that's being renovated for multi-generational living. The homeowners give the crew a tour and explain how the new spaces will be used.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

18

Glen Ridge: Vintage

0%
April 4, 202427m

Demo has begun uncovering 150-year-old wine bottles in the walls. A chimney is demolished, and the roof is reframed. The architect shares his inspiration for the project, and the mayor gives a tour of the Borough's gas lamps. Asbestos is abated.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

19

Glen Ridge: Small But Mighty

0%
April 11, 202427m

Termite damage has caused major construction changes. New footings are needed in the basement. A historic community garden is toured. A 15-year-old student talks about working on the project. The old sewer line is replaced without trenching.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

20

Glen Ridge: QR Construction

0%
April 18, 202427m

Installing helical piers for the new porch; prepping new windows for installation; protecting plumbing pipes from cold weather.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

21

Glen Ridge: Roughed In

0%
April 25, 202427m

The new flangeless windows are installed water and air tight. Preparation begins for in-ceiling speakers. The Empire State Building is visited. Porch decking is installed to minimize waste, and a hybrid plumbing system is chosen for the house.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

22

Glen Ridge: Next Level Tight

0%
May 2, 202427m

Air tightness is taken to the next level with vapor barrier electrical boxes. The homeowner designs a custom lead glass sidelight. Various types of weather-resistant barriers are explored. Drip edge flashing and exterior window trim are installed.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

23

Glen Ridge: A Breath of Fresh Air

0%
May 9, 202427m

The new staircase is manufactured in a shop and assembled on-site. The shop is toured. The homeowner installs a new brick walkway. Wood fiber insulation and the new HRV system are explored. The architect talks about the interior trim details

Read More

You need to be logged in to continue. Click here to login or here to sign up.

24

Glen Ridge: Tested and Approved

0%
May 16, 202427m

A blower door test reveals the home's airtightness; a baseboard trim gets a radius detail; discussing the borough's effort to maintain its tree-lined streets; installing a prefab tile niche; prepping interior trim for paint finish.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

25

Glen Ridge: Spring Forward

0%
May 23, 202427m

Building a custom mudroom bench from reclaimed wood; the primary bathroom gets a custom paint finish; spring landscaping; installing kitchen crown molding above the cabinets and recessed lighting.

Read More

You need to be logged in to continue. Click here to login or here to sign up.

Back to top

You need to be logged in to continue. Click here to login or here to sign up.

Can't find a movie or TV show? Login to create it.

Global

s focus the search bar
p open profile menu
esc close an open window
? open keyboard shortcut window

On media pages

b go back (or to parent when applicable)
e go to edit page

On TV season pages

(right arrow) go to next season
(left arrow) go to previous season

On TV episode pages

(right arrow) go to next episode
(left arrow) go to previous episode

On all image pages

a open add image window

On all edit pages

t open translation selector
ctrl+ s submit form

On discussion pages

n create new discussion
w toggle watching status
p toggle public/private
c toggle close/open
a open activity
r reply to discussion
l go to last reply
ctrl+ enter submit your message
(right arrow) next page
(left arrow) previous page

Settings

Want to rate or add this item to a list?

Login